> ## Documentation Index
> Fetch the complete documentation index at: https://docs.bold-factory.com/llms.txt
> Use this file to discover all available pages before exploring further.

# Analyze data

> Review production, activity, progress and cost indicators to make decisions using reliable data.

Use **Analyze data** to review shop floor activity and costs. This section brings together production dashboards and cost analysis.

## Production

<Columns cols={2}>
  <Card title="OEE by station" icon="gauge" href="/en/guides/manufacturing/view-oee-by-workstation">
    Review a workstation's availability, performance and quality.
  </Card>

  <Card title="OEE trends" icon="chart-line" href="/en/guides/manufacturing/view-oee-evolution">
    Compare shop floor performance by month or year.
  </Card>

  <Card title="Monitor production in real time" icon="activity" href="/en/guides/manufacturing/monitor-production-in-real-time">
    View employee activity, active stations and production records.
  </Card>

  <Card title="Downtime and losses" icon="circle-alert" href="/en/guides/manufacturing/analyze-stops-and-production-losses">
    Find repeated stops, reduced production speed and quality problems.
  </Card>
</Columns>

## Costs

<Columns cols={2}>
  <Card title="Prepare cost data" icon="database" href="/en/guides/costs/prepare-cost-data">
    Review items, employees, resources, purchases, consumption and time records before analyzing.
  </Card>

  <Card title="Item costs" icon="boxes" href="/en/guides/costs/analyze-item-costs">
    Review planned cost per unit and its breakdown into materials, labor and machine costs.
  </Card>

  <Card title="Employee costs" icon="users" href="/en/guides/costs/configure-employee-costs">
    Configure the hourly cost applied to manufacturing and maintenance.
  </Card>

  <Card title="Manufacturing orders" icon="factory" href="/en/guides/costs/manufacturing-order-costs">
    Compare planned and actual production costs.
  </Card>

  <Card title="Work orders" icon="wrench" href="/en/guides/costs/work-order-costs">
    Review actual labor, material and maintenance action costs.
  </Card>

  <Card title="Inventory valuation" icon="warehouse" href="/en/guides/costs/value-inventory">
    View valuation by item, lot or location.
  </Card>
</Columns>

## Before analyzing

Indicators depend on complete operational records. If time records, pauses, quantities, consumption, prices or lots are missing, correct the underlying data first.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.