- Purchase frequency (daily, weekly, or monthly): defines the periods used to group needs.
- Include needs up to: limits the horizon of needs queried.
- Urgent: needs whose date already requires attention.
- This period: needs included in the current period.
- Next period: needs in the following period.
- Future: later needs within the chosen horizon.
Organize by supplier or item
Select one of the four blocks to see purchasing needs for that period, sorted by urgency. Bold lets you change the view to suit your purchasing strategy using two tabs:- By supplier (recommended for daily work): groups needs by the company selling them (for example, Patas Paco or Madera, S. A.).
- By item: shows each material (for example, 5 mm screws or pine boards). This is useful when investigating a specific shortage.
Purchasing analysis
Path: Planning > Purchase assistant > Supplier1
Interpret stock
Review the stock data in each column before purchasing. The system combines the available variables and proposes a quantity. Compare the proposal with lead times, minimum quantities, and the stock forecast.Reorder point: projected stock level at which Bold proposes starting procurement.Proposal: quantity calculated by Bold. You can change it, reset the calculation, or clear the field to exclude the item from the current order.
2
Open the item
Select an item to expand its analysis charts and tables.Use Purchase orders to compare the proposal with open or previous orders, Stock forecast to review the estimated effect of the purchase, and Consumption history to compare it with recorded issues.
Purchases for a manufacturing order
Path: Production > Production orders > MO > Materials > Open purchase assistant This access is available whenever the MO has materials pending consumption, even if they are already covered. If materials are missing, the link appears as Resolve with purchase assistant. From a manufacturing order, the assistant shows all pending MO materials procured through Buy in one table, including both missing and covered materials.- Supplier: Bold proposes the primary supplier for each item. You can change it to any secondary supplier configured on the item.
- Proposal: quantity still to be covered. Covered materials appear dimmed with a proposal of 0. You can change any item’s quantity to purchase it anyway.
- Propose what the production order needs for all: proposes the quantity the MO still needs to consume for each item, without deducting available or expected stock.
- Reset all quantities: restores the calculated proposal.
- Clear all quantities: sets them to 0.