Before you start
You need:- a finished item configured as manufacturable;
- an active recipe for the product;
- an employee and a resource ready to execute the operation;
- a test customer or a real customer;
- permission to create orders, requests, and manufacturing orders.
Create demand from the order
1
Create the order
Go to Planning > Sales orders and complete the general details: customer, customer order number, date, delivery instructions, and notes, where applicable.
2
Add the line
Select the requested item, enter the quantity, and set the delivery date.
3
Confirm the line
Confirm the line when you want it to generate demand. While it is a draft, it does not affect planning.
4
Review availability
Check available stock, planned supply, and the quantity still to be covered.
Turn demand into an MO
1
Review the need
Open planning or the operational view you use to review manufacturing needs. Find the item, quantity, and date from the order.
2
Create the manufacturing request
Turn the recommendation into a request. For a first test, you can also create a manual request with the same quantity and date as the order.
3
Open the request
Check the item, quantity, required date, and quantity pending assignment.
4
Create the MO
Generate a manufacturing order from the request. Select the active recipe and confirm the quantity you will manufacture.
5
Review the order
Check that the MO has operations, inputs, an output, a date, and a compatible resource if the process requires one.
What should happen
You can split a request into several MOs if you manufacture in lots or multiple batches. For the first walkthrough, create a single MO with the order quantity.
If you cannot create the MO
Detailed guides
Create an order
Record the customer’s commitment and confirm lines.
Know what to manufacture
Turn reviewed needs into manufacturing requests.
Create an MO without a sales order
Generate executable work from a request.
Manufacturing requests
Understand the difference between a need and its execution.
Next step
Once the MO exists and has executable operations, record the first execution on the shop floor.Execute your first MO
Start the operation, record progress, consume materials, and finish production.