1
Identify the schedule
Add a name that identifies the scheduled maintenance.
2
Select the asset
Specify the asset on which it should be performed.
3
Define the cause
Select the reason for the maintenance.
4
Configure frequency
Specify how often it should be performed. Use Weekdays to generate it Monday through Friday.
5
Configure the time
Enter the planned time or times for performing it.
6
Select the generation policy
Choose how Bold should act if an open work order already exists.
Generation policies
An open work order is pending, in progress, or paused.
Example: you want to inspect packaging machine ENV-01 every Monday at 06:00. Create a Weekly inspection cause, add actions such as Check pressure, Clean filter, and Attach photo if there is wear, and use Skip if there is an open work order. If the previous week’s work order is still open, Bold does not create another.
Enable, disable, and delete
You can change these options from the Actions column in the main preventive maintenance view or from the schedule details.- If a schedule is enabled (green), Bold generates work orders when the next occurrence arrives.
- Disabling it (red) preserves its configuration but stops generating work orders and clears the next pending generation.
- Enabling it again makes Bold recalculate the next generation from the rule.
- Deleting it disables it and you cannot recover it. Work orders it generated still link to it, and it appears in read-only mode with the Deleted label.