Downtime reasons explain why an operation or group of operations stops. They can be planned, such as a break or shift change, or unplanned, such as a breakdown, missing materials, or a quality issue. Recording the reason lets you analyze losses and recurring stops.

Steps to follow

Path: Production > Downtime reasons > + (New reason) Name: enter a short title that is easy to recognize on the pause screen. For example: Lunch, Scheduled maintenance, Shift meeting, or Line cleaning. Description (optional): explain when to use the reason so the whole workshop follows the same criteria. For example: 30-minute break for the morning shift. Use only between 13:00 and 14:00. Downtime type: choose Planned or Unplanned. The form explains how each option affects OEE.
  • Planned: for predictable stops in your usual operations, such as Lunch, Shift change, or Scheduled cleaning. Their duration is deducted from the workstation’s scheduled time to calculate planned production time, so they do not reduce the workstation’s availability or OEE.
  • Unplanned: for unexpected events such as Electrical fault, Raw material shortage, or Machine jam. Their duration counts as lost production time, so they reduce availability and, with it, OEE.
OEE (%) = (availability (%) / 100) × (performance (%) / 100) × (quality (%) / 100) × 100. Availability (%) is (actual operating time / (workstation scheduled time − planned stops that stopped it)) × 100. See View OEE by workstation to review each indicator.