Path: Production > Production orders > Launched order Open an MO to view its routing and change data that remains editable according to the order’s status.

Header indicators

The header summarizes the MO status:
  • Overall progress: a percentage (0 %) and a numeric counter (0 of 3) indicate how many product units have been completed.
  • Product details: identifies the quantity and item being manufactured (for example, 3 x White outdoor table 100x80).

What can change

Finished or cancelled orders cannot be changed.

Order actions

The three-dot menu next to the order code gathers the actions available according to its status:
  • Print label: asks for a label template of the Operations of a production order type and opens a PDF of the order’s labels printed with it. It is only available when such a template exists.
  • Block: prevents continuing with the order until it is unblocked. Use it for an issue that must be resolved before proceeding.
  • Delete: deletes the order when its status and activity still allow it.
The menu also shows who created and changed the order and, for administrators, its change history. The other actions sit next to what they change:
  • Assign workstations: the icon next to the menu reassigns operations’ machines or work centers.
  • Add operation: above the operations table and over the diagram, adds an unplanned operation, such as additional sanding.
  • Add restriction: above the restrictions table and over the diagram, adds a dependency between operations.

Create material requests

In Materials, the Create request for this material icon appears when the item is configured for manufacturing procurement and has no linked request yet. This action creates a manufacturing request linked to the MO material. It does not generate a purchase order or warehouse movement. Quantity (units): enter how many units you need. The system proposes the quantity still pending consumption based on the initial plan. You can change this number manually. If you need additional material to cover defective pieces or waste, replace it with the quantity needed. Notes (optional): add instructions for whoever supplies the material or explain why the quantity differs from the plan. Code: Bold generates it from the MO code and configured prefixes. If a request with the same base already exists, it adds the first available suffix.