Steps to follow
Path: Production > Pause reasons > Add new reason Name: enter a short title that is easy to recognize on the pause screen. For example:Lunch, Scheduled maintenance, Shift meeting, or Line cleaning.
Description (optional): explain when to use the reason so the whole workshop follows the same criteria. For example: 30-minute break for the morning shift. Use only between 13:00 and 14:00.
Planned: enable this checkbox when the pause is scheduled. Bold treats it as an organizational stop, so it does not penalize efficiency indicators (OEE) or count as a technical failure.
Leave it unchecked for unexpected events such as Electrical fault, Raw material shortage, or Machine jam.