Causes
A cause classifies a work order’s main or auxiliary reason.
A work order can have a main cause and auxiliary causes. Auxiliary causes should not duplicate the main one.
Requires stopping the machine
Select the Requires stopping the machine checkbox on causes whose work requires stopping the equipment, such as changing a blade. It is on the cause creation dialog and on its edit form. New work orders copy the value from their main cause, and you can change it on each work order. Changing the value on the cause does not modify existing work orders. Open work orders that require stopping the machine make the workstation unavailable in production plans, and only those work orders count as maintenance downtime in the OEE. See Work orders.Actions
An action is a reusable task or check you can complete in a work order.
Define actions when you want to standardize work, measure compliance or compare interventions.
If you complete an action, you must provide a result compatible with its type.
Instructions and execution notes
Each work order action has two different texts:Mandatory actions
An action can be mandatory. You cannot finish a work order while it has incomplete mandatory actions. Non-mandatory actions can remain pending and stay in history. You configure whether an action is mandatory in the cause’s planned action, and this is copied to the work order when created. You can also mark an action as mandatory when adding it directly to the work order. In Maintenance > Work orders, you can change it with the padlock button in the Actions column or remove the action from the work order. You cannot change it in work mode. If you make a mistake when completing an action, use Undo on it. The action becomes planned again; its result and the reference to the employee who completed it are cleared, but execution notes are preserved. You can then complete it again with the correct result. You cannot undo actions in a completed or canceled work order.Relationship between cause and action
A cause can plan common actions, each with instructions and a mandatory setting. When you create a work order, Bold copies those actions to it. This helps work orders include consistent checks for a type of incident. Example: the Hydraulic leak cause can plan actions such as Inspect hose, Check pressure (mandatory) and Clean area. Each action of a work order belongs to one of its causes, so the technician knows why they do it:- Actions copied from a cause, when you create the work order or add an auxiliary cause, belong to that cause.
- If you add an action by hand and the work order has several causes, you choose which one it belongs to. If it has only one, it belongs to it.
- If you remove an auxiliary cause or change the main one, its actions move to the main cause. None are deleted.