Steps to follow
Path: Production > Processes > + (New operation type) Name: use a short technical name identifying the action, such asPressing, Packaging, Drilling, or Quality control.
Description: detail the tasks included in the process. For example, for Joining pieces in textiles, you could write Construction and sewing (overlocking and flat stitching) of front and back panels.
Assign workstations to the process
After creating the process, specify the workstations where it can run. Assign one or more as appropriate. Path: Production > Processes > Created process > Workstations + Assign workstation Workstation: select the machine, line, or table where the process can run. For example, forWelding, select TIG welding workstation 02.
Workstation type (Primary or Auxiliary): defines this machine’s role in the process.
- Primary: usual workstation for the process. Each process has one primary workstation. Assign equivalent lines as auxiliary workstations; selecting another primary changes the previous one to auxiliary.
- Auxiliary: backup workstation used when the primary workstation is unavailable or unsuitable for a particular job.
Example: for a
Bottling process, mark Automatic line 01 as Primary and Manual packaging table as Auxiliary for emergencies or small lots.